Beeline Paving Project To Slow Traffic Near Sunflower

Advertisement

The Arizona Department of Transportation will begin a $2.7 million project this week to repave a seven-mile segment of State Route 87 approximately 30 miles south of Payson near Sunflower (mileposts 218-225). The work will continue through the end of September and include removal of a layer of the existing pavement, repaving the roadway, and drainage improvements.

Work hours will be 6 a.m. to 5 p.m. Monday through Thursday. Drivers can expect alternating lane restrictions in both directions with minimal delays through the work zone. Vehicles will be limited to a maximum width of 14 feet.

ADOT advises drivers to proceed through the work zone with caution, slow down, and be alert for construction equipment and personnel.

For more information, visit www.azdot.gov/prescottprojects.

Comments

Use the comment form below to begin a discussion about this content.

Requires free registration

Posting comments requires a free account and verification.