Maintenance Work Scheduled For Sr 188 By Roosevelt Lake

Drivers should expect reduced speeds, lane closures and short delays

Hwy 188 at Roosevelt Bridge.

Hwy 188 at Roosevelt Bridge. Photo by Andy Towle. |

Advertisement

A pavement maintenance project has begun on SR 188 by Roosevelt Lake. Motorists traveling in that area should anticipate 15-minute delays while crews repair sections of the roadway.

The project starts just west of the SR 188 and SR 288 junction (milepost 233) and continues west for 23 miles toward Punkin Center (milepost 256). Work will be done from 6 a.m. to 5 p.m. Monday through Friday until Sept. 20. Drivers should expect narrowed traffic lanes and a reduced speed limit with flaggers and pilot vehicles present to guide vehicles through the work zone.

ADOT advises drivers to proceed through the work zones with caution, slow down, and be alert for construction equipment and personnel.

For more information about this project, please contact the project hotline 1.855.712.8530 or email Projects@azdot.gov.

Comments

Pat Randall 5 months, 3 weeks ago

I think someone needs to look at a map and see what direction these highways go.

0

Requires free registration

Posting comments requires a free account and verification.